• MechanicalJester@lemm.ee
    link
    fedilink
    arrow-up
    2
    ·
    9 months ago

    I don’t understand your statement. The Mythical Man Month teaches exactly that lesson of more bodies != Faster in many cases.

    How long to build the site with 1 full stack dev? 1.5 years.

    How long with an existing high performance team of 5? 2 months.

    How long if you hire 4 plus the one original (all qualified)? 1 to 1.5 years.

    How long if we hire 30 full stack devs? Maybe never.

    • deadbeef79000@lemmy.nz
      link
      fedilink
      arrow-up
      1
      ·
      9 months ago

      Poorly worded on my part.

      They fully bought into the idea of the man-month without realising it was mythical.

      • MechanicalJester@lemm.ee
        link
        fedilink
        arrow-up
        2
        ·
        9 months ago

        You know? I literally figured that out a minute before I saw your reply. And I rolled my eyes at myself.

        That makes sense. Silly me

        Cheers