They’re over by a factor of 6 which would add up to 21 hours, not 24. I don’t know what they’ve done to get 2.5 million, it should be 417 thousand with those numbers.
Edit: Oh dear. They said each oven could completely cook 6 turkeys in a day so they rounded to that number. At least it no longer reads GW/day.
The source
The Phénix reactor shut down in 2009 so I think that was the end of France’s breeder reactors. India, China and Russia still have operating breeder reactors.
Breeding from non-fissile material is different to reprocessing though. Reprocessing is a chemical process, not a nuclear one. The UK had an operational reprocessing capability - though it is being decommissioned now because it wasn’t cost effective with such a small fleet. Japan is still trying to bring its reprocessing plant online (after years of trouble). However France is doing it routinely for their domestic fleet and some foreign reactors IIRC. The USA made reprocessing illegal back in 1977 due to proliferation concerns. Despite that ban being repealed, they haven’t set up the regulatory infrastructure to be able to do it so no one has bothered. Maybe the new nuclear industry will shake that up a bit.