First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • @[email protected]
    link
    fedilink
    English
    111 months ago

    How is solar, wind, or hydro not “clean”? The generating of the power, not the building of the facilities, building anything is never clean.

    • @[email protected]
      link
      fedilink
      English
      111 months ago

      People count material, fuel and ecological with nuclear as well, so why not count it with hydro, wind and solar? Concrete is concrete.

      • @[email protected]
        link
        fedilink
        English
        011 months ago

        Because all technology will require that. If we want energy, we have to build stuff. But there’s no fuel to buy, generally much less ecological impact due to limited waste products since no fuel is being “burned”. And the building cost is one time and generally subsidized, and maintenance is considerably lower, not to mention labor since you don’t need nuclear specialists to run the day to day.